WebJan 14, 2024 · The Construction Workers of the Hoover Dam Over 5,000 workers were employed to build the dam. The lowest wage was 50 cents an hour, and the highest was … WebThe Construction Project Completed. All in all, Hoover Dam stood 725 feet high, is 1244 feet wide, 660 feet thick at the base, tapering to a thickness of 45 feet at the top. It cost a total of $165 million to build and was …
Hoover Dam History When Was Hoover Dam Built?
WebHoover Dam is 726 feet (221 metres) high and 1,244 feet (379 metres) long at the crest. It contains 4,400,000 cubic yards (3,360,000 cubic metres) of … WebHoover Dam’s spillways could float a battleship, and Lake Mead, when filled to capacity, contains enough water to cover Connecticut 10 feet deep. It would take a maximum of 5,218 men (employed in any one month) a total … camp atterbury id card section
10 of History
WebThe dam project provided opportunity for hope. As the contractor, Six Companies, Inc. began hiring workers, none of the first 1,000 were African American. This was a time when housing, bathrooms and drinking water were segregated. WebThe dam builders came in 1931. A handful of men did the planning and designing of the dam. There were another 16,000 workers who did the actual building. Many of these men had families, wives and children, who came with them. Why would so many people come out to what was, at the time, a raw, undeveloped and dangerous place to live? WebJun 30, 2024 · To accommodate the workers, an entire community, Boulder City, was built at the beginning phase of the dam's construction works. As the construction period coincided with the U.S. Great Depression (1929-1933), many unemployed workers had already moved to the dam's site along with their families seeking a job opportunity. Construction of the … camp atterbury gym hours